|
|
 |
Cascade Shoring’s Slide Rail shoring system provides an economical alternative to conventional "tight sheeting" methods. It is ideal for use in poor soil conditions and where soil support is required. You will find this system to be: - Cost effective
- Easy to install and remove quickly with a small crew
- Of modular, flexible design
Further benefits to slide rail shoring: - The dig and push system allows low vibration installations and provides soil support for excavations, adjacent structures and existing utilities
- The system is installed from the top down and removed from the bottom up, minimizing size of excavation, soil disturbances, and restoration time and cost.
- 4-sided pit application provides for tank installation, pump station construction, placing of vaults, and environmental mitigation.
- For larger applications where cross braces are not possible, a Clear Span System can be installed using external walers, tiebacks, and sacrificial struts at the bottom of the excavation.
- The linear system accommodates pipeline installations.
Please Call or email for more information on sizes & price.
 |
| There aren't any products available on our website. Please call for the latest products. |
|
 |
|
|
|
 |
|